Follow us on Facebook

Green Future Technologies Solution for the new world-class Parts Distribution Centre in Perth

Green Future Technologies Solution for the new world-class Parts Distribution Centre in Perth

Building Automation Solution for Komatsu new world-class Parts Distribution Centre in Perth

Lynx Integrated Systems completed the Building Automation Solution for Komatsu's new world-class Parts Distribution Centre in Perth with an area of 16,000 m2 this project includes the purchase 47,000 m2 of land adjoining the existing Perth site, and takes Komatsu’s total site area in Perth to 127,000 m2

The scope of works was to Design and commission a complete Building Automation System solution to the 16,000 square metre area, including two story office building and workshop.

Solution included a Green Future Technologies user control ‘GUI interface’, control of all lighting, monitoring of the Exit & Emergency lighting and integration with the Building Management System & security system.

Applications which included were a combination of local control, timed control, PE cell control, present detection, remote and automated control, day light harvesting and a fully monitored Exit and Emergency lighting system to the entire project.

Special features included the use of DALI light fittings & Emergency light fittings on the one system.

 

The Result - state of the art energy efficient Building Automation System giving the client complete control.

Presence detection workshop video      https://www.youtube.com/channel/UCWVOYp2RsyIjlQD4igqjj4A

Leave a Reply

* Name:
* E-mail: (Not Published)
   Website: (Site url with http://)
* Comment:
Type Code